Due to a crane lift operation for the Bldg. 50 Pergola Project, Perlmutter Road will be closed and some parking in the area will be blocked from 4 a.m. on Saturday to 6 p.m. on Sunday. https://pim.lbl.gov/resource/site-construction-map-updates/
January 2019 – July 2022
Due to a crane lift operation for the Bldg. 50 Pergola Project, Perlmutter Road will be closed and some parking in the area will be blocked from 4 a.m. on Saturday to 6 p.m. on Sunday. https://pim.lbl.gov/resource/site-construction-map-updates/