In response to PG&E’s public safety power shutdown last week, Berkeley Lab teams worked together over a six-day period to safely bring the Lab’s power down and then bring the Lab back up again. “We worked together as one Lab,” said COO Michael Brandt, praising the efforts of all involved. https://youtu.be/BuWB1eLD9b0